Printed Wiring Assemblies (PWAs)
Improper cover installation causing lifted pad
Operator
improperly installed cover clamp while leads were tack
soldered to pads resulting in lifted pads. This was
the result of the operator not receiving the proper
training on the installation of the cover clamp. Damage
resulted in having to scrap flight board.

Reference
:
NASA-STD-8739.2,
CHAPTER 5 - TRAINING AND CERTIFICATION PROGRAM
5.1 General
1. The supplier is responsible for maintaining a documented
training program that meets the requirements of this
Standard.
2. The supplier shall assure that the personnel are
familiar with the requirements of this Standard, SMT
reflow soldering techniques, and other pertinent requirements
of the contract. The supplier shall implement a training
program that provides the necessary training of soldering
and inspection personnel in parts mounting and connection
requirements, soldering techniques, and use of equipment
and procedures pertinent to their responsibilities in
performance of the contract requirements. The supplier
is responsible for certifying and maintaining the certification
of each individual who solders, inspects, or instructs.
Operators, inspectors, and instructors shall be qualified
to fulfill all requirements of this Standard involved
in their assigned tasks.
|